Completed Projects

PROJECTS COMPLETED

___________________________________________________________________________

 

 

PROCESS OF INDUSTRIAL PLANT

GENERAL CONSTRUCTION, MAINTENANCE & ENGINEERING

Client: Guam Oil and Refining Co. (Agent: Ralph Parsons Corp.)

Location: Guam, Marianas Islands, USA

Project: Grassroots Petroleum Refinery (29,500 BPD)

Project Date: October 1969 - February 1971

Contract Cost: Cost-Plus (Labor Supervision only)

Actual Contract Cost - US $714,178.00

Client: Bataan Refining Corporation (Petron Corp. Subsidiary)

Location: Petroleum Refinery (110,000 BPD) located at Limay, Bataan.

Projects:

  • Process Heater (H-600) Turnaround/Retubing, cooler Cells Fabrication and Tank Insulation Work (Turnaround materials furnished by Client).
  • Furnishing of Design Engineers, Draftsmen, and Specialized Manpower for Instrument Modernization Project.
  • Design/Installation/Commissioning of various electrical Works Involving the power, lighting and communications system (electrical apparatuses furnished by Client)
  • Design/Installation of Telemetering System for Storage Tanks and Instrumentation System of Asphalt Oxidizer.
  • Design/Installation of Electrical Facilities for six (6) Storage Tanks.
  • Civil & Instrumentation Works for APS#2 Debottlenecking Tankage Facilities.
  • Electrical & Instrumentation Works O APS#2 Crude Desalting Facilities.
  • Installation/Commissioning of new Telephone Cable Lines at BRC Compound.
  • Emergency Rehabilitation of Fire-damaged Avgas and Propane Plants Electrical/Instrument System.
  • Design/Installation of Electrical System for Tank 101 Agitators
  • Design/Installation of Electrical & Instrumentation System for one (1) 35 MB LPG Storage Sphere S-1113).
  • Design/Installation of Electrical & Instrumentation Facilities for Heaters H101/102 & H-600 Revamps.
  • Design/Installation of Electrical & Instrumentation system for Crude Tanks 110/111.
  • Design/Installation of tanks 108/109 Motor-operated valves Electrical System Remote Control Panel Relocation.
  • Install electrical/instrumentation/piping system for PNA 3000 Sodium Analyzer.
  • Install electrical system for Tanks 336/338/348.
  • Assembly, balancing, and installation of twenty (20) Loading Arms including installation of lateral pipings from headers to new loading arms and replacement of five (5) existing deteriorated product pipe headers.
  • Construction of T-2401 Side Re-boiler.
  • Construction of Tanks 341/343/342/344/350/351 Fixed Foam Facilities/Stilling Well for Servo Gauge and Roof Ladder.
  • Relocation of 28" Zero Crude Oil Pipeline above Pier Deck.
  • Construction of Stilling Well for Servo Gauge with operating platform at Tanks 350/351.
  • Replacement of Third Course Shell of Tower T-600 during September 1986 Turnaround.
  • Tower T-102 Tray 5 replacement.
  • Internal De-gassing/cleaning of Storage Tank No. 105 (IFO)
  • Installation of Imported HVGO Transfer Pipeline System
  • Installation of DFO/Kero Jet Fuel Loading Pipeline to Pier Ex-Tank 102/104 for Third Party Processing
  • Installation of DEA Pump, Piping, and Electrical System

Aggregate Contract Cost: PHP 30,592,946.00; Plus US $43,300.00; Plus Japan Y 26,622,000.

Remarks: Above contract Cost excludes cost of Apparatus, Equipment, and Devices furnished by Client on its account.

Client: Marinduque Mining & Industrial Corporation (Manager - Bechtel Overseas Corporation)

Project Date: 1973-1974

Project: Nickel Refinery (12,000 DMT Ore/day) located at Nonoc Island, Surigao City

Contract Cost: PHP 2,236,244.00

Client: Filoil Refinery Corporation (Petrophil)

Location: Petroleum Refinery (15,000 BPD) located at Rosario, Cavite:

Projects:

  • Repair/retubing of all six (6) Process Heaters during Refinery Turnarounds in 1968, 1969, and 1972 (materials furnished by Client).
  • Assembly/overhauling/installation/testing of Process Exchangers, Condenser, Coolers and Piping modifications (materials furnished by Client).
  • Repairs, sandblasting, repainting of storage tanks and vessels/columns (painting materials furnished by Client).

Aggregate Contract Cost: PHP 829,408.00

Client: CALTEX (Philippines), Incorporation

Location: Caltex Batangas Refinery

Projects:

  • Installation/Commissioning of various Electrical Works involving the power, lighting, and communication system (Electric apparatus/devices furnished by Client) at Caltex Batangas Refinery.
  • On-the-run relocation/hookup/testing/commissioning of Instrumentation System of Polymer Plant to a Central Control House at FCCU (Materials furnished by Client at Caltex Batangas Refinery.
  • Construction, including clearing/grading of site of four (4) first class Service Stations.
  • Repair, renovation, face-lifting of Service Stations in Central and Northern Luzon.
  • Design, preparations of specifications/ estimates/construction drawings of Training Center Building at Cebu.
  • Repairs/maintenance/modifications of Utilities System.
  • Caltex (Batangas) Refinery Instrument System Modernization at Plants 2,4,5,and 11.

Aggregate Contract Cost: PHP 5,631.535.00.

Remarks: All materials, devices, apparatus, and equipment in item No.7 (above), were furnished by Client on its account.

Client: GENERAL ELECTRIC (PHILIPPINES), INC. (Prime Contractor)

 

Location: Mariveles, Bataan

Project: Ford Automotive Body Stamping Plant:

Project Date: 1973-1974

Contract Cost: PHP 312,147.00

(All substation equipment, devices, and cables Accessories furnished by General Electric).

Client: FORD (Philippines), INC.

Location: Automotive Assembly Plant located at Metro Manila:

Project: Installation, Testing/Commissioning of main substation additional Transformer/H.V. and L.V. Switchgears

(1500 KVA, 34.5 KV/440V) in 1975.

Contract Cost: PHP 91,000.00 (Transfer, Switchgears and Devices furnished by Client).

Client: COLUMBIAN CARBON (Philippines), INC.

Location: Carbon Black plant located at Limay, Bataan:

Project Date: 1967

Projects:

  • Installation/hookup, testing/commissioning of Instrumentation system. (Instruments/devices/materials furnished by Client).
  • Supervision of electrical work done by AG7P and termination of 13.8 KV cables.

Contract Cost: PHP 132,660.00

Client: COLGATE-PALMOLIVE PHILIPPINES, INC.

Location: Cosmetic/Detergents/Toiletries Manufacturing Plant

Project Date: 1969-1979

Project: Furnishing required Engineering, Field Manpower, supervision and Tools for all Fabrication, Piping, Erection, Welding, Mechanical, Electrical, and Instrumentation works of on-going plant expansion, renovation, repair, and maintenance.

Contract Cost: PHP 1,773,900.00

Client: COLGATE-PALMOLIVE PHILIPPINES, INC.

Location: Lucena City

Project: Rehabilitation of DOP Unit Instrumentation at Oleochemical Plant

Project Date: May 20, 1985 - August 23, 1985

Contract Cost: Php 3,000,000.00

Client: ELIZALDE IRON & STEEL CORPORATION

Location: Cold Roll Mill Plant located at Pasig, Metro Manila:

Project Date: 1968-1969

Project: Erection of two-lawyer brick walls (approximately 12,700 square meters) for the Plant.

Contract Cost: PHP 1,771,681.00

(Labor/Supervision & Tools only: all materials furnished by Client).

 

 

NON-MANUFACTURING FACILITIES

GENERAL CONSTRUCTION

Client: U.S. DEPARTMENT OF THE NAVY (c/o Office-in-Charge, U.S. Naval Facilities Southwest Pacific)

Projects:

  • Renovation of Cold Storage Warehouse, Bldg. 1012, at U.S. Naval Supply Depot. This project involved the reconstruction of the Cold Storage Building (approximately 3,000 square meters for floor area and the complete replacement of the existing refrigeration system, including the electrical and instrumentation system, with a bigger and much more modern, automatically-operated system (117 Tons capacity). Our work included installation, testing, commissioning, start-up of the system and training of U.S. Government personnel designated to operate and maintain the cold storage facilities and refrigeration system.
  • Electrical works on 4160-Volt distribution system, at Rivera Point, Subic Naval Station.
  • Additional facilities for Emergency Generating System's increased capacity at Clark Air Base.
  • Install Muse Boilers, Piping and Electrical Facilities at Leyte Wharf, Subic Naval Station.
  • Renovation of Taxiway Lighting at U.S. Naval Station, Cubi Point, Subic Bay, Philippines.
  • Auto Hobby Shop Construction at NAS, Cubi Point, Philippines.
  • Renovate Bldg. 8271, NAS, Cubi Point, Philippines.
  • Install, test, commission Liquid Oxygen/Liquid Nitrogen Equipment and Facilities, Bldg. 8100, U.S. Naval Air Station, Cubi Point, Philippines.
  • Re-roof (approximately 58,000 square feet, 4 ply built-up roofing with 3" insulation and lightweight concrete underneath) Bachelor Officers Quarters at Cubi, Point, U.S. Naval Air Station, Philippines.
  • CPO Club Bldg., Renovation and Extension and installation of new electric, mechanical, air-conditioning and other club facilities at Cubi Point, U.S. Naval Air Station, Philippines.

Aggregate Contract Cost: US $3,067,487.40

Client: COMMISSION ON ELECTIONS, REPUBLIC OF THE PHILIPPINES

Project: Complete Rehabilitation of the Electrical System & Facilities of the Delta Motor Corporation Building located at Pasong Tamo Extension, Makati City in 1987.

Aggregate Contract Cost: PHP 491,000.00

Client: EXPORT PROCESSING ZONE AUTHORITY

Project: NEC-TP Electrical Project located at Mactan -Export Processing Zone, Lapu-Lapu City.

Supply of all required materials, electrical equipment, labor, superintendence, tools/ equipment for the accomplishment of Project.

Contract Cost: PHP 2,160,000.00

Client: PETRON CORPORATION

Location: Petron Bataan Refinery - Limay, Bataan/ Rosario, Cavite/ Iloilo Bulk Plant/ Bacolod Bulk Plant/ Legaspi Bulk Plant/ Batangas Terminal

Projects:

  • Installation of Additional Eight (8) Marine Loading Areas at Product Pier. Nov.14, 1991

Contract Cost: PHP 1,780,000.00

  • Off-Unit blending Facilities Upgrade, October 1991 - April 28, 1992

Contract Cost: PHP 6,006,000.00

  • Crude Feeding Scheme Simplification

Contract Cost: PHP 2,500,000.00

  • Replacement of Fender Frames at Product Pier

Contract Cost: PHP 7,250,000.00

  • Protective Instrumentation for Boilers, 1, 2 & 3

Contract Cost: PHP 28,416,513.00

  • Replacement of Fender Frame at Petron Bataan Refinery Product Pier

Contract Cost: PHP 7,100,000.00

  • Phosphate Injection Facilities for GODU

Contract Cost: PHP 1,787,500.00

  • Resizing of P-2000 Suction and Discharge Piping

Contract Cost: PHP 2,060,000.00

  • Installation of A/C System for Cafeteria and Utilities Control Room

Contract Cost: PHP 1,000,000.00

  • Replacement of P-1004 A/B

Contract Cost: PHP 330,000.00

  • Load Shedding Scheme

Contract Cost: PHP 600,000.00

  • Rehabilitation of Telephone lines at Petron Bataan Refinery Plantsite & Housing complex

Contract Cost: PHP 3,847,792.74

  • Sour Water Facilities Upgrade.

Contract Cost: PHP 12,425,000.00

  • Process Control Room A/C System Upgrade.

Contract Cost: PHP 1,430,000.00

  • Upgrade of PDCV 1050 A,B and C Local Control to DCS, completion date: May 16, 1996

Contract Cost: PHP 1,520,000.00

  • Installation of New Substation "T" Feeder Lines, Completion Date: August 3, 1996

Contract Cost: PHP 7,000,000.00

  • Slop Feeding Facilities Upgrade, Completion Date: September 30, 1996

Contract Cost: PHP 7,000,000.00

  • Installation of Electrical System for Deep Ground Bed IC-CPS & Concrete Cathodic Protection System, Completion Date Sept. 20, 1996

Contract Cost: PHP 2,602,991.00

  • Installation of New P-1005 Facilities, Completion Date: January 27, 1997

Contract Cost: PHP 4,800,000.00

  • Caustic Neutralization Facilities Upgrade, Completion Date: March 2, 1997

Contract Cost: PHP1,850,000.00

  • Installation of LPG Carousel and Facilities, location: Rosario, Cavite, Completion Date: October 19, 1991

Contract Cost: PHP 5,514,559.33

  • Installation of 5000 GPM & 1400 GPM Transfer Pumps, Completion Date: August 30, 1997

Contract Cost: PHP 8,503,000.00

  • Bulk Asphalt Export Loading Facilities, Project Date: 24 March 1997

Contract Cost: PHP 38,750,956.00

  • Electric Rehabilitation at Rosario Terminal, Project Date: July 16, 1997 - December 12, 1997

Contract Cost: PHP 14,800,000.00

  • Electrical Rehabilitation at Iloilo Bulk Plant, Project Date: July 16, 1997 - February 10, 1998

Contract Cost: PHP 6,888,000.00

  • Construction of LPG Filling Plant Building & Facilities Bacolod Bulk Plant, Project Date: November 2, 1997 - June 14, 1998

Contract Cost: PHP 34,911,208.76

  • Electrical Rehabilitation at Bacolod Bulk Plant, Project Date: November 2, 1997 - June 14, 1998

Contract Cost: PHP 7,100,000.00

  • Construction of LPG Filling Plant Building & Facilities, Legaspi Bulk Plant, Project Date: November 2, 1997 - November 15, 1998

Contract Cost: PHP 35,414,601.76

  • Construction of LPG Facilites at Limay Terminal, Project Date: January 5, 1998 - August 2, 1998

Contract Cost: PHP 7,505,000.00

  • Electrical Rehabilitation at Mandaue B/P, Project Date: May 4, 1998 - December 14, 1998

Contract Cost: PHP 17,033,635.20

  • Upgrading at Mandaue Bulk Plant, Project Date: August 17, 1998 - April 18, 1999

Contract Cost: PHP 29,760,154.00

  • Installation of LPG Safety Facilities at Limay Terminal, Project Date: February 22, 1999 - July 21, 1999

Contract Cost: PHP 5,675,288.00

  • Electrical Rehabilitation at Gasul Bulk Plant, Project Date: March 1, 1999 - August 2, 1999

Contract Cost: PHP 7,130,000.00

  • Construction of LPG Filling Facilities at Batangas Terminal, Project Date: February 22, 1999 - July 21, 1999

Client: Caltex Refinery Batangas

Project: Installation of Flame Scanners for CO Boiler (Caltex Refinery Batangas)

Contract Cost: US $ 175,000.00

Client: CBI Philippines Inc.

Project: Electro-Mechanical Works for S-1115 Sphere and Tank-355 (CBI Philippines Inc.)

Project Date: December 1997 - December 1998

Contract Cost: PHP 17,100,000.00

Client: UNION AJINOMOTO/FORNEY CORP.

Project: Installation of Burner Management Systems

Project Date: November 1998 - May 1999

Contract Cost: US $ 378,900.00

Client: PETRON CORPORATION

Location: Petron Bataan Refinery - Limay, Bataan/ Mandaue Terminal/ Iloilo Bulk Plant/ Davao Depot/ Mabini Terminal

Projects:

  • Separate HVN Feeding to PWF & CCR, Project Date: March 19, 2001 - May 22, 2001

Contract Cost: PHP 950,000.00

  • Replacement & Resizing of D-102 & D-3207 Offgas Line to D-600, Project Date: May 2, 2001 - December 14, 2001

Contract Cost: PHP 2,800,000.00

  • Kero Hydrosweetener Modifications, Project Date: May 14, 2001 - July 12, 2001

Contract Cost: PHP 650,000.00

  • Installation of Fixed Monitors Between Tanks 349 & 355, Project Date: May 28, 2001 - July 26, 2001

Contract Cost: PHP 630,000.00

  • Installation of Meters and Accuload at Limay Terminal, Project Date: August 14, 2001 - February 14, 2002

Contract Cost: PHP 13,900,000.00

  • Installation of Product Metering System at Mandaue Terminal, Project Date: June 10, 2002 - September 10, 2002

Contract Cost: PHP 8,975,000.00

  • Installation of Dedicated Receiving Lines at Iloilo Bulk Plant, Project Date: September 24, 2002 - November 29, 2002

Contract Cost: PHP 3,978,000.00

  • Installation of Receiving Lines Product Meter and Piping at Davao Depot, Project Date: October 7, 2002 - December 7, 2002

Contract Cost: PHP 1,995,600.00

  • Water Recovery System & R/L at Mabini Terminal, Project Date: March 1, 2003 - June 30, 2003

Contract Cost: PHP 2,230,000.00

  • CNU Restoration Project at Petron Bataan Refinery, Project Date: May 15, 2002 - July 15, 2003

Contract Cost: PHP 77,000,000.00

  • Energy Efficiency Project at Petron Bataan Refinery, Project Date: August 16, 2003 - August 16, 2004

Contract Cost: PHP 25,000,000.00

  • CNU Hazop Works at Petron Bataan Refinery, Project Date: August 16, 2003 - November 16, 2003

Contract Cost: PHP 5,200,000.00

  • Energy Efficient Project at Petron Bataan Refinery, Project Date: August 16, 2003 - August 16, 2004

Contract Cost: PHP 25,000,000.00

  • Refinery Power System Upgrade at Petron Bataan Refinery, Project Date: July 15, 2004 - January 15, 2005

Contract Cost: PHP 25,000,000.00 + US $1,316,000.00

  • Substations Load Rationalization at Petron Bataan Refinery, Project Date: December 14, 2004 - June 11, 2005

Contract Cost: PHP 45,691,738.00 + US $1,594,080.54

  • Modification of LPG Spheres S-1103 & S-1105 Water Deluge System Phase 1 at Petron Bataan Refinery, Project Date: April 17, 2006 - September 13, 2006

Contract Cost: PHP 8,688,000.00

  • Replacement of Feeder Line at PBR Housing Electrical Substation at Petron Bataan Refinery, Project Date: September 11, 2007 - January 16, 2008

Contract Cost: PHP 4,982,000.00

Client: CBI Philippines Inc.

Project:

  • CBI Subcontract for Propylene Storage and Loading Facilities at Petron Bataan Refinery - (Electrical & Instrumentation Works), Project Date: May 11, 2006 - March 13, 2008

Contract Cost: PHP 19,332,483.00 + US $ 426,650.00

  • CBI Subcontract for Propylene Storage and Loading Facilities at Petron Bataan Refinery (Mechanical Works), Project Date: January 8, 2007 - March 4, 2008

Contract Cost: PHP 36,562,609.82 + US $ 71,000.00

Client: Petron Corporation

Location: Petron Bataan Refinery - Limay, Bataan

Projects:

  • Installation of Linear Heat Detection Systems at Tk-108, 109,110,111, Project Date: December 3, 2007 - April 2, 2008

Contract Cost: PHP 13,914,346.14

  • Modification of Water Deluge System at LPG Spheres S-1109 & S-1113, Project Date: July 21, 2008 - November 17, 2008

Contract Cost: PHP 14,047,227.42

  • Refinery UPS Upgrading Project at Petron Bataan Refinery, Project Date: June 2, 2008 - July 4, 2009

Contract Cost: PHP P117,000,000.00